Process of Works
Floor and Drainage
Floor level lowered to base of foundation and replaced with Hardcore infill.
Sump liner installed to 100mm drainage channel and dual pump system with battery back-up and alarm fitted.
Waterproof Membrane System
Studded damp-proof membrane system added to walls.
Damp-proof membrane system added to floor with heat welded overseal.
Insulation
50mm solid floor insulation is added with 1200 guage DPM plastic.
50mm solid wall insulation is added.
Finishing
12.5mm plasterboard and 2 coat plaster finish.
Optional laminate floor, structural work and decoration.